National Early Careers Group UK and Ireland
Site Visit: Future Biogas Gonerby Moor Anaerobic Digestion Plant
- Date From 8th June 2026
- Date To 8th June 2026
- Price £5.00.
- Location Old Great North Road, Great Gonerby, NG32 2AB, United Kingdom.
Overview
Future Biogas' Moor Bioenergy plant in Gonerby Moor is a pioneering renewable energy facility that produces biomethane from locally sources crops. The plant also integrates innovative carbon-capture systems, highlighting practical pathways towards low-carbon energy.
Attendees will hear directly from the Head of Bioprocess, project engineers, managers during a dedicated panel session, offering insights into operational challenges, process optimisation and ongoing innovation.
The material presented has not been peer-reviewed. Any opinions are the presenter's own and do not necessarily represent those of IChemE or the National Early Careers Group. The information is given in good faith but without any liability on the part of IChemE.
Back to events